Shed moving part 2.

[ Follow Ups ] [ Post Followup ] [ Off Topics Forum ] [ FAQ ]

Posted by Island Mike on September 06, 2018 at 15:12:17 [URL] [DELETE] :

Bought a chain cumalong. Did not trust the cable unit. Removed much stuff from shed. Have a C section of steel bolted to the two large log skids. Connected chains and cumalong to a large tree and cranked. The shed moved. Jacked up long skid logs and put rollers under. Shed moved with less effort. Put a large roller log under skids, and it moved easier again. I need to turn the shed just under 180 degrees. When the large roller log gets more centered I will do the big turn.
The shed needs to go down a slide grade to get on more level ground. When it gets there and the turn is complete, I think Herb 9N can push it in to the new place.
So far no seniors have been injured.

4600


Follow Ups:


Post a Followup:
Name   : 
E-Mail : 
Subject: 
Message: To add a single image to your post, click here. To add multiple images to your post, click here. Optional Link URL : http://www.yourwebsite.com Link Title : Website Title Optional Image URL: http://www.myimages.com/mypic.jpg
Enter image characters into the text box.

Press Preview Message button below to proofread message & check if images and/or links are shown before posting message. Press
browser's back button if correction is needed. Press Post Message button on Preview Message page to finalized your post. Thanks!
  
   

[ Follow Ups ] [ Post Followup ] [ Off Topics Forum ] [ FAQ ]